Commercial Contracts 2025

BARBADOS Trends and Developments Contributed by: Melanie Jones and Shane Kingston, Lex Caribbean

conveyances. The type of structure selected is there - fore an important consideration for the acquisition of real estate, the development and operation of the project, and its future sale by the developer. In certain contexts, careful drafting of constitutive documents of entities in the relevant structure is critical. Vehicles used to facilitate collective investment in projects often require the crafting of provisions catering to dif - ferent classes of shares, and the rights, entitlements and restrictions attaching to each. In the hospitality sector, development holding entities and operating entities may require very specific private equity-styled provisions to facilitate investment and exit strategies. Contractual and regulatory risk in development and construction Once the scope of the project has been defined, developers will usually issue requests for proposals (RFPs) as part of the procurement process to iden - tify and select prospective suppliers, consultants and contractors. At this stage, proposals often incorporate the submitting party’s standard terms of service. In accepting such proposals, care must be taken to ensure that only the developer’s provisional accept - ance is indicated on the basis that the engagement is subject to contract, in the form of a written agreement between the parties. Typically, this contract would be initiated by the developer’s legal team and will super - sede any prior agreements and negotiations. It is vital that the developer’s RFP documents include express language making this position clear, and that the for - mal contract eventually executed between the parties includes an “entire agreement” clause recording the parties’ agreement to be bound only by the terms of the developer’s written agreement, and not by any other extraneous terms. This is critical to avoiding a “battle of the forms” argument over which party’s terms actually apply to the engagement, and to pre - venting the developer’s carefully drafted protections and risk management contract provisions from being displaced. For construction projects, selecting and adapting an appropriate form for the suite of project contracts is central to effective risk management. Internationally recognised construction contract forms – such as those of the American Institute of Architects, Joint

Contracts Tribunal or the Fédération Internationale des Ingénieurs Conseils – may be used, but these must be tailored to Barbados’ legal and regulatory framework. For example, local law requires that architects and engineers must be registered in Barbados in order to practise their profession on the island. Develop - ers seeking to employ prestigious design firms from other countries may therefore still need to engage locally registered professionals to work in tandem with their foreign counterparts and to provide certification for permits, code compliance and final construction documents. Whether engaged as sub-consultants or under direct contract with the developer, each con - tract should carefully delineate the respective party’s scope of work to ensure both regulatory compli - ance and seamless integration of services. Vigilance is required to make sure that there are no gaps in responsibility/accountability to the developer; where locally registered professional and foreign counter - parts have shared responsibility and/or taken on com - plementary roles. Copyright in design materials Contract terms must be modified to accord with local law in the context of the licensing of intellectual prop - erty rights. Many copyright materials will be produced in the course of a construction project and will be used throughout its life – from construction, marketing, repair and maintenance, to demolition. For example, an architect’s drawings might be used in every one of these stages. The wide range of purposes for which copyright material is required means that many differ - ent parties need to use it, such as a developer, a con - tractor, other design consultants, or a party providing finance in relation to a project. The use of copyright material without the permission of the copyright owner constitutes an infringement giving rise to legal liability. It is therefore critical that development agreements, building contracts and professional appointments include copyright licences that are sufficiently broad in scope to cover all foreseeable uses of the material in order to avoid such infringement. Further, express lan - guage should be included to state that the copyright licence granted is irrevocable and non-terminable, to ensure that the licence cannot be withdrawn after it has been granted, and that it will continue even if the underlying agreement is terminated.

24 CHAMBERS.COM

Powered by