Commercial Contracts 2025

SWITZERLAND Law and Practice Contributed by: Andrea Haefeli and Michael Kissling, Walder Wyss

• Other Statutory Regimes: For instance, liability for motor vehicle owners, nuclear installations, or environmental damage is based on strict liability considerations. 5.4 Contractual Limitation on Liability In line with the principle of freedom of contract, which carries significant weight under Swiss law, the parties to a commercial contract are generally free to limit or entirely exclude liability. That being said, several restrictions apply, the most important ones being: • As a general rule, liability cannot be limited in advance in cases of gross negligence or wilful mis - conduct, although such limitations may be agreed after the occurrence of damage. • According to prevailing legal doctrine, liability limi - tations are invalid in case of bodily injury or death. • Liability limitations in connection with commercial activities that require official state licences (eg, banks, and railway operators), including those for slight negligence, may be declared null and void at the court’s discretion. • Various statutes provide for special liability regimes, for example regarding product liability. A deviation from the general liability limitation rules can be found in sales contract law. Some legal schol - ars argue that liability for defects in goods may be excluded even in cases of fault or gross negligence. In any case, defects that go entirely beyond what a buy - er could reasonably expect, and which substantially undermine the contract’s economic purpose, cannot be covered by a general waiver of warranty or liability. In addition, liability cannot be excluded where defects have been fraudulently concealed. Further, legal scholars debate whether liability limita - tions should generally be invalid where the nature of the contractual relationship itself stands against them. The most frequently cited example concerns mandate (service) contracts, as a service provider is statutorily obliged to perform all services diligently and carefully, which also sets the standard of liability. To date, there is no Swiss Federal Supreme Court precedent on this question.

While liability limitations in GTC are not per se pro - hibited, they are subject to rules on GTC control (see 3.3 Standard Terms and Conditions – 3.6 Battle of Forms ). In particular, liability limitation clauses may be deemed unusual (the so-called unusual clause rule; see 3.4 Application of Local Law on Standard Terms ) and therefore not applicable. In consumer contracts, liability limitations may also lead to a sig - nificant imbalance of rights and obligations and thus be invalid under Article 8 of the Unfair Competition Act (see 3.5 Ineffectiveness of Standard Terms due to Unreasonable Disadvantage ). Accordingly, even if a liability exclusion is valid under the general rules, it must additionally pass the test of GTC control in the individual case. Under Swiss law, the lack of a specific force majeure clause does not preclude relief from performance in circumstances outside a party’s control. Such cases are usually dealt with under the following rules: • Impossibility: If performance subsequently becomes objectively and permanently impossible due to circumstances for which the obligor is not at fault (eg, natural disasters, government measures, and war), the obligor is released from its obliga - tion to perform. Both parties are released from their respective obligations– ie, the obligor from performing and the obligee from paying, etc. Any consideration (eg, payment) already given must be returned. However, there are also special statutory rules which provide otherwise. • Fundamental Change of Circumstances (Clausula Rebus Sic Stantibus): Judicial adaptation or (as a last resort) termination of a contract may be sought under the concept of clausula rebus sic stantibus. However, Swiss courts tend to apply this doctrine very restrictively and the clausula thus serves as an exceptional remedy. Pursuant to established case law, the key elements are as follows: 6. Force Majeure and Hardship 6.1 Concept of Force Majeure (a) There must be a fundamental change of cir - cumstances after the conclusion of the con - tract. (b) The change must not have been reasonably

384 CHAMBERS.COM

Powered by