SWITZERLAND Trends and Developments Contributed by: Andrea Haefeli and Michael Kissling, Walder Wyss
Introduction This article outlines recent and forthcoming develop - ments in Switzerland that are particularly relevant to commercial contracts. Key topics include upcoming and potentially upcoming revisions to the Code of Obligations (CO) in the areas of sales contracts and contracts for works, with a focus on warranty provi - sions (see section 1 below); revisions in the field of sustainability, such as the right to repair and ecode - sign (see section 2 below); and potentially evolving rules on product liability (see section 3 below). A fur - ther development of note is Switzerland’s initiative towards mutual recognition of electronic signatures with the EU (see section 4 below), promoting digi - talisation and the secure use of electronic signatures across borders. The introduction of a legal basis for international commercial courts (see section 5 below) and the accession to the Hague Convention on Choice of Court Agreements (CCCA) (see section 6 below) reinforce Switzerland’s position as a forward- looking jurisdiction for international business. Finally, the article provides an update on the current status of the Switzerland–EU package (see section 7 below). 1. Revisions to the Swiss Code of Obligations related to Sales Contracts and Contracts for Works 1.1. Revised warranty provisions for construction defects The Code of Obligations (CO), specifically the warran - ty of quality and fitness provisions in sales contracts and contracts for works law, has been revised with the aim of strengthening the rights of buyers and custom - ers in relation to construction defects. The revision will enter into force as of 1 January 2026 and apply to contracts concluded from this date onwards. The key changes to the CO are: • Mandatory Minimum Period of 60 Days for Defect Notice ( Rügefrist ): In principle, notice of defects must be notified “immediately” after the inspection has been carried out (open defects) or when the defect is discovered (hidden defects). The inspec - tion must be carried out as soon as it is “feasible in the normal course of business” after delivery. Such obligation to give immediate notice (ie, within a few days) is impractical in connection with construction defects. Therefore, the current notice period will be
replaced by a notice period of 60 days for (i) prop - erty purchases or (ii) immovable works. In addition, the 60-day notice period will also apply to (iii) mov - able purchased items (eg, windows) and movable works (eg, the interior paintwork of a building) that have been integrated into an immovable work in a manner consistent with their nature and purpose and whose defects have caused the immovable works to be defective and/or (iv) movable works that have been created by an architect or engineer (eg, plans) and used in a manner consistent with their nature and purpose as the basis for the crea - tion of an immovable work and whose defects have caused the immovable work to be defective. The 60-day notice period is unilaterally mandatory – ie, it cannot be shortened (but can be extended). • Mandatory Right to Free Rectification ( unentgeltli- che Verbesserung ): Buyers and customers have a right to free rectification for construction defects affecting a building. This applies to (i) property purchase contracts, when the building is still to be built or newly completed within the two years before the sale, and (ii) contracts for works relating to buildings. The right to free rectification is man - datory and cannot be excluded in advance. Buyers and customers can choose whether to exercise any existing rights of reduction and/or rescission (see also the Swiss Law and Practice chapter , section 7.1) or their right to rectification. While the current law for contracts for works already includes a right to rectification (albeit not a mandatory one), the revision now also introduces a (mandatory) right to rectification in property sales law. • Mandatory Minimum Five-Year Limitation Period ( Verjährungsfrist ): In the following cases the limita - tion period for warranty rights remains five years, but will be unilaterally mandatory and cannot be shortened (but can be extended): (c) movable works that have been incorporated in an immovable work in a manner consistent with their nature and purpose and have caused the immovable work to be defective; and (d) when asserting rights for defects in an immov - able work against the architect or engineer who provided services in connection with such work. (a) property purchases; (b) immovable works;
389 CHAMBERS.COM
Powered by FlippingBook