D. R. Congo Trends and Developments Contributed by: Paulin Mbalanda, Didier Mopiti and Rodrick Elekeleme, MBM CONSEIL
• Foreign investors should actively engage Congo - lese partners who meet the local content/subcon - tractor eligibility criteria. A well-structured Congo - lese co-contractor may ease regulatory approval and speed execution. • Allocation of risks in the subcontracting chain must reflect local content obligations: a foreign investor may wish to retain rights to audit the local subcon - tractor, require compliance reporting and include fallback termination rights if local content quotas are not met or regulatory thresholds are breached. • Negotiation should include regulatory-compliance clauses, for example, conditionality of execution upon ARSP registration, ministry approval and fil - ing requirements. • Pricing and currency risks should also be addressed: for instance, the need to pay subcon - tractors in local currency might be mandated; the contract should specify currency risk adjustment. • Insurance and indemnification: given enforcement risk, the contract should allocate liability for regula - tory non-compliance (for example, if ARSP delists a subcontractor or sanctions an operator). Monitoring and audit rights Given increased oversight by ARSP and sector min - istries: • The contract should provide for audit rights: the main contractor (especially foreign) should have contractual access to the subcontractor’s books, performance reports, regulatory filings and local- content compliance documentation. • Subcontracting agreements should require periodic certification or reporting that the subcontractor remains eligible and registered. • Consider including termination or penalty clauses for non-compliance, for example, if subcontracting exceeds the 40% cap or fails to meet Congolese- ownership criteria. • Include a clause for regulatory change: given the evolving environment (eg, sectoral guide, ministe - rial orders), the contract should allow revisiting the obligations if the Government issues new rules.
Practical documentation checklist For foreign investors negotiating and drafting con - tracts in the DRC with subcontracting components, the following checklist is recommended: • Confirm applicable law: Subcontracting Law + implementing decrees; Mining Code; sector-specif - ic orders (eg, Hydrocarbons Order). • Confirm regulatory entity oversight: ARSP regis - tration; relevant ministry filings and submission deadlines. • Define the contract parties in alignment with the legal definitions: project owner, main contractor, subcontractor. • Verify subcontractor eligibility: Congolese-corpora - tion status, ownership structure, ARSP registration. • Review scope of work: ensure clarity of what is being subcontracted vs what is to be performed in-house. • Monitor value caps: particularly in mining (40% cap) or any other sector-specific limits. • Incorporate compliance obligations: registration, filing, reporting, audit rights, sanctions for non- compliance. • Include fallback/termination remedies: for regula - tory non-compliance, delisting of subcontractor, breach of local content obligations. • Include currency, tax and labour compliance clauses (eg, local employment quotas). • Provide for regulatory change: renegotiation or adjustment mechanism if new laws/regulations emerge. • Document the interface between the main con - tractor and subcontractor: chain of responsibility, supervision obligations, liability, indemnities. Major implementation challenges and risks for foreign investors Despite the relatively mature legal framework, several practical challenges and risks remain, such as the fol - lowing. Semantic and role ambiguity The legal definitions remain somewhat ambiguous. For instance, the Subcontracting Law envisages three actors (project owner, main contractor, subcontractor) and a contract of enterprise. Yet in mining practice, it is common to have only two parties (the title holder and
146 CHAMBERS.COM
Powered by FlippingBook