D. R. Congo Trends and Developments Contributed by: Paulin Mbalanda, Didier Mopiti and Rodrick Elekeleme, MBM CONSEIL

the subcontractor) and no clear intermediary contrac - tor. This divergence creates uncertainty over whether the arrangement qualifies as a “subcontracting” one (triggering the full regime) or a regular service/sup - ply contract. These grey zones can cause regulatory surprises and enforcement risk for foreign investors. Overlapping regimes and sector-specific inconsistencies The interaction between the general Subcontract - ing Law, the Mining Code, sector-specific orders (eg, Hydrocarbons Order), ARSP/FEC sectoral guide and international investment treaties can be complex. For a foreign investor, compatibility of contract obliga - tions across these layers must be carefully managed – especially when local content provisions may conflict with investor rights under bilateral investment treaties or stability clauses. Regulatory oversight and enforcement While some of the regime remains aspirational, recent moves (eg, Hydrocarbons Order, ARSP/FEC sectoral guide) indicate the government is gearing up enforce - ment. Foreign investors face risks such as: • contracts not being recognised because the sub - contractor is unregistered or ineligible; • audits and demands for retroactive compliance (eg, submission of selection plans by oil companies); • potential administrative sanctions (including sus - pension/closure) or reputational risk if local content obligations are ignored; and • delays and increased cost if regulatory clearance (eg, registration, submission to ministry) is required before execution. Contractual risk: scope creep and value thresholds In practice, subcontractors may perform additional tasks (eg, services, supply of goods) which may push total subcontracting beyond the 40% threshold or may convert the nature of the contract (service vs sup - ply vs subcontracting) in unanticipated ways. Foreign investors must monitor this carefully and include con - tractual guardrails to prevent scope creep. Local-content vs foreign control tension The DRC’s local-content policy aims to reduce domi - nance by foreign multinationals and boost national

enterprise. For foreign investors, this means greater pressure to find partners, to restructure contracts so that local firms feature meaningfully, and to accept supervisory or joint-venture arrangements. Non-align - ment can lead to regulatory friction, slower procure - ment approvals or adverse public relations outcomes. Contract-drafting and negotiation: practical guidance From the vantage point of a foreign investor negotiat - ing in the DRC market, the following are some practi - cal drafting and negotiation tips. Negotiate early with compliance in mind • Include a due-diligence phase (pre-contract) where the subcontractor is vetted for ARSP registration and local-content eligibility. • Negotiate conditionality: execution is subject to subcontractor registration, ministry approval (where applicable) and regulatory compliance. • Agree on a timeline for submissions and build in contractual remedies (termination, adjustment) if deadlines are not met. Define clear scope and value boundaries • In the main contract, define the split of activities: which parts are to be performed by the contract - ing foreign investor and which by the Congolese subcontractor. • Include a clause to monitor cumulative subcon - tracting value, for example, an annual aggregation mechanism and an alert if approaching 40%. • Provide flexibility: if the 40% cap is reached, include a mechanism for scaling down subcontrac - tor scope or converting parts of the work to non- subcontracting supply/service contracts. Embed local-content and audit clauses • The subcontracting agreement should include obli - gations on the subcontractor to meet local employ - ment quotas, use Congolese materials/services and report performance to ARSP or the ministry. • Include a clause requiring the subcontractor to submit its annual selection plan, provider profile (for oil and gas) or ARSP-filed data. • Audit clause: the foreign investor (or main contrac - tor) has the right to inspect the subcontractor’s

147 CHAMBERS.COM

Powered by